Canning City Centre Activity Centre Plan

Share on Facebook Share on Twitter Share on Linkedin Email this link

This consultation has concluded.

We are interested in hearing what you think of the draft Activity Centre Plan for the Canning City Centre.

The vision is to create a re-energised city centre with a community heart that is connected, accessible, vital and resilient.

The Activity Centre Plan is a long term vision for the City Centre to guide public and private investment and will evolve over the years.

The Canning City Centre Activity Centre Plan was adopted as a Local Planning Policy 20 September 2016.

You can view the revised Activity Centre Plan Part One and Part Two 2016 and the previous Structure Plan 2013 by clicking on the highlighted links or in the document library. Appendices to Part Two are also available in the document library.

For more information on why the Canning City Centre Plan was developed, the main changes and why we are advertising the Canning Activity Centre Plan as an Activity Centre Plan as a Local Planning Policy at the same time; please view the FAQs.

If you have any queries please call the City on 1300 422 664.

The revised Canning City Centre Activity Centre Plan was adopted on 20 September 2016.

We are interested in hearing what you think of the draft Activity Centre Plan for the Canning City Centre.

The vision is to create a re-energised city centre with a community heart that is connected, accessible, vital and resilient.

The Activity Centre Plan is a long term vision for the City Centre to guide public and private investment and will evolve over the years.

The Canning City Centre Activity Centre Plan was adopted as a Local Planning Policy 20 September 2016.

You can view the revised Activity Centre Plan Part One and Part Two 2016 and the previous Structure Plan 2013 by clicking on the highlighted links or in the document library. Appendices to Part Two are also available in the document library.

For more information on why the Canning City Centre Plan was developed, the main changes and why we are advertising the Canning Activity Centre Plan as an Activity Centre Plan as a Local Planning Policy at the same time; please view the FAQs.

If you have any queries please call the City on 1300 422 664.

The revised Canning City Centre Activity Centre Plan was adopted on 20 September 2016.